Select the task being carried out and the tool creates a sensible work sequence. Amend every step for the actual site, add your own stages, then print or save the final method statement as a PDF.
Important: This tool creates a method statement for fire alarm works only. It must be reviewed alongside the site risk assessment, client procedures, permits, access arrangements, system impairment controls and emergency procedures before work starts.
Fire Alarm Method Statement Builder
1. Method Statement Details
2. Select Fire Alarm Task
The task selection gives you a useful starting sequence. Check it reflects the site, client procedures and actual work before relying on it.
3. Site Controls and Preparation
These controls print above the critical stages, so the engineer has the important site arrangements in one place.
4. Generate and Export
Select a fire alarm task and add suggested work stages to build the method statement.
Download CSV for Excel or print directly to PDF. The final document includes subtle pmcontrols.co.uk branding in the footer.
Select a task and choose Add Suggested Work Steps, then amend the stages for the actual site.
1
What a Fire Alarm Method Statement Should Include
Planned work sequence A clear step-by-step order from arrival and notification through to testing, reinstatement and handover.
System impairment controls Agreed notification, monitoring isolation, temporary fire measures and confirmation that the system is restored.
Access and PPE Suitable access equipment, PPE, permits, tools and controls for the actual building and task.
Testing and handover Functional testing, cause and effect checks where required, records, defects and handover to the responsible person.
Editable stages Rewrite, remove, move or add stages so the final method statement reflects the real job.
Printable documents Create a clean PDF-ready document with site details, controls and a subtle PM Controls footer.
Fire Alarm Method Statement FAQs
Can I edit the suggested critical stages?
Yes. Every stage can be rewritten, deleted, moved up or down, and supplemented with your own custom stages.
Does this work for fire alarm maintenance and fault finding?
Yes. The task dropdown covers routine maintenance, annual servicing, weekly testing, fault finding, emergency repairs, detector testing and more.
Can I use it for installation and commissioning?
Yes. It includes starting sequences for new installations, cabling, extensions, panel replacement, commissioning, recommissioning and cause and effect testing.
Can I save it as a PDF?
Yes. Select Print / Save PDF, then choose Save as PDF in the browser print window. You can also download the editable stages as a CSV spreadsheet.